-  Mon May 20, 2013 1:09 pm
					 #367933
						        
										
										
					
					
							When I release a node from a job while rendering I see a drop in SL. 
Does that mean its better to stop the job and resume it with fewer nodes when I need to release a node from rendering ?
Francois
					
										
					  															  										 
					 
					 
					  					                Does that mean its better to stop the job and resume it with fewer nodes when I need to release a node from rendering ?
Francois



 - By Forum Moderator
 - By Forum Moderator