- Mon May 20, 2013 1:09 pm
#367933
When I release a node from a job while rendering I see a drop in SL.
Does that mean its better to stop the job and resume it with fewer nodes when I need to release a node from rendering ?
Francois
Does that mean its better to stop the job and resume it with fewer nodes when I need to release a node from rendering ?
Francois