Everything related to Maxwell network rendering systems.
By lllab
#150136
Hi all, is it possible to stop a cooprendering before time and sl is done?

i have one running for 8h that is enough, but i have it set by accident to about 3days...

cani just stop it and manually merge the mxi file from the servers?

thanks for help

cheers
stefan
User avatar
By dyarza
#150189
Yes, just select the job and click stop job. The auto merge will probably fail but you can gather the .mxi files from each node's M~R install folder and merge manually.
By lllab
#150407
thanks, i tried but nothing happened, maybe i have to wait longer to let it stop?

cheers
stefan
User avatar
By dyarza
#150882
You can merge the.mxifiles manually. They get saved lije a jpg would as the rendered reaches each sl, so even if the network manager is stuck, the .mxi will have the last SL solution. They are in the N~R install folder of each node by the name of Cooperative.mxi

D
Help with swimming pool water

Hi Andreas " I would say the above "fake[…]

render engines and Maxwell

Other rendering engines are evolving day by day, m[…]