- Thu Oct 08, 2009 11:35 pm
#311089
Hi,
What command parameter combination should I use in order to resume on a previously rendered mxi?
I've tried the following:
1. Using both -mxi and -resume and let them point to the same mxi path. This does not lead to resuming, but it starts all over.
2. Using only -resume flag, does not work since it tries to write the mxi to the path saved in the mxs. This path is not valid in this case, and there is an error. It does not lead to resuming anyhow.
Has anyone succesfully resumed an MXI through command line?
Cheers,
- Björn
What command parameter combination should I use in order to resume on a previously rendered mxi?
I've tried the following:
1. Using both -mxi and -resume and let them point to the same mxi path. This does not lead to resuming, but it starts all over.
2. Using only -resume flag, does not work since it tries to write the mxi to the path saved in the mxs. This path is not valid in this case, and there is an error. It does not lead to resuming anyhow.
Has anyone succesfully resumed an MXI through command line?
Cheers,
- Björn
industrial design and visualization (http://www.syse.se)