Everything related to Maxwell network rendering systems.
User avatar
By xoom
#378516
Hello to all
from the V03, I have a problem to make the rendering cooperative mode, if I do not check "send dependencies" it takes only 7 nodes, while I am 24 available.
this is a shame because 95% of my textures are maxwellref, and I did not need to check on the V02 to enjoy all nodes.
on the forum you are right not check "send dependencies", but if I do not it takes only 7 knots, and I tried many times and always the same result.
And this problem must create another for the cooperative mode is struggling to move on to other jobs after. So either I have time and I run a lot of single works or I will wait until the job.
RLM is installed on the master node, I have not checked rlm other nodes, no license problem, and the most amazing I have no error message.
if you have any ideas?

xoom
the render does not start

Also open the Console and read through it to see i[…]

Sketchup 2024 Released

I would like to add my voice to this annual reques[…]