- Thu Nov 14, 2013 10:11 pm
#373231
I did a batch job using all the available nodes in the licence.
As the machines are all diferent I had 3 that finished, but other two that are still working in the Network.
I wanted to use them to do another render, but there was no way, because maxwell thinks I am exceeding the maximum number of nodes.
I restarted the 3 machines and made sure they do not show in the Network Monitor where the other two are still rendering, but cannot use them.
it seems that i have to wait the batch job to be finished, as if I would have been using all the machines for it all the time.
Ernesto
As the machines are all diferent I had 3 that finished, but other two that are still working in the Network.
I wanted to use them to do another render, but there was no way, because maxwell thinks I am exceeding the maximum number of nodes.
I restarted the 3 machines and made sure they do not show in the Network Monitor where the other two are still rendering, but cannot use them.
it seems that i have to wait the batch job to be finished, as if I would have been using all the machines for it all the time.
Ernesto