- Tue Dec 06, 2011 7:32 pm
#350350
when a node disconnects from a job, its status remains "disconnected" forever.
It's not possible to refresh the display even if the node is added to the job again.
A proper status report and refresh would be really helpful...
It would be nice to be able to remove a node from the job, but keep the mxi (transfer it to the manager) and then clear its status...
It's not possible to refresh the display even if the node is added to the job again.
A proper status report and refresh would be really helpful...
It would be nice to be able to remove a node from the job, but keep the mxi (transfer it to the manager) and then clear its status...
Maxwell 3.2.1.2 - Win 7 x64