- Sun Sep 25, 2011 11:25 am
#347326
Hi,
I 'd prefer to manually merge the MXI's produced on each node when I stop a network rendering. The merging process is a default, I guess. Aside from quitting out Manager and Monitor(and i'm not sure that really even does it) right after the MXI's are written, I can find no way to do this 'cleanly'.
So:
1.)Which program in the suite actually does the merging?
2.) How can I set this not to happen after 'Stop Job' is validated in the Monitor?
thank you.
Peter
I 'd prefer to manually merge the MXI's produced on each node when I stop a network rendering. The merging process is a default, I guess. Aside from quitting out Manager and Monitor(and i'm not sure that really even does it) right after the MXI's are written, I can find no way to do this 'cleanly'.
So:
1.)Which program in the suite actually does the merging?
2.) How can I set this not to happen after 'Stop Job' is validated in the Monitor?
thank you.
Peter