Everything related to Maxwell network rendering systems.
By Cadhorn
#366324
Let's say I've got another node rendering something already, when I send another job to the same node (via "Add Job"), sometimes it says the newly added job is Pending and sometimes it says it's Running... (even if something else is already rendering on that node). I've noticed that subsequent jobs labeled "running" don't actually ever run, even after the node has finished the 1st job. If the subsequently added jobs are labeled "Pending" then the other node will render them one after the other as expected. Any ideas what is going on? Is this a bug or a feature I'm just not understanding correctly?

edit: all the various little issues I was having with network rendering disappeared when I upgraded my network. :D Before, it was a mix of wired/un-wired connections from 1Gb/s to 150Mb/s (pretty fast to pretty slow). Now, with everything wired at 1Gb/s... no trouble at all ever.
Help with swimming pool water

Hi Andreas " I would say the above "fake[…]

render engines and Maxwell

Other rendering engines are evolving day by day, m[…]