Page 1 of 1

Two men and an indoor swimming pool

Posted: Mon Aug 19, 2013 4:12 pm
by Kevron
Hi, just something short and quirky for testing out a Realflow - Cinema 4D - Maxwell pipeline regarding alembic, particles and hybrido 2.

It was not smooth sailing. Renderkit v3 and Realflow 2013 does not work well with Maxwell 2.7 - but I reckon that will change with v3.
Also strange problems with network rendering, a lot of "hanging" under "preprocessing data". Did not find out why this happened.

I have had other projects that have rendered out across the network without any fuss.

Image

https://vimeo.com/72650629

Regards,
Tor Martin

Re: Two men and an indoor swimming pool

Posted: Mon Aug 19, 2013 10:27 pm
by Bubbaloo
Nice test!

Re: Two men and an indoor swimming pool

Posted: Tue Aug 20, 2013 3:00 pm
by RobMitchell
Yeah, very cool test! Not sure why but I always assumed the shorter character was a woman for some reason.

Re: Two men and an indoor swimming pool

Posted: Tue Aug 20, 2013 10:58 pm
by Bubbaloo
RobMitchell wrote:Yeah, very cool test! Not sure why but I always assumed the shorter character was a woman for some reason.
Me too!

Re: Two men and an indoor swimming pool

Posted: Wed Aug 21, 2013 10:55 am
by Kevron
Thanks! Hehe, yes the shorter character has a feminine appearance. I guess the hair is not the most masculine part of him.